Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://www.shionoe.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 护士被两个病人伦奷日出白浆 | 国内精品国产三级国产av| 亚洲色成人网站www永久四虎| 全球av集中精品导航福利| 亚洲综合av永久无码精品一区二区| 午夜精品久久久久久久久| 无码中文精品专区一区二区| 国产日产精品_国产精品毛片| 女人国产香蕉久久精品| 内射毛片内射国产夫妻| 成 人 免费 黄 色 网站无毒| 人妻被按摩到潮喷中文字幕| 又色又爽又黄的视频网站| 欧美大片va欧美在线播放| 高潮毛片无遮挡高清免费视频| 八区精品色欲人妻综合网| 领导边摸边吃奶边做爽在线观看| 又大又粗欧美黑人aaaaa片| 欧洲精品码一区二区三区| 一区二区三区高清视频一| 色欲av无码一区二区人妻| 国精产品999香蕉| 亚洲小说图区综合在线| 久久久久久亚洲精品| 亚洲色18禁成人网站www| 波多野结av衣东京热无码专区 | 亚洲av永久无码精品水牛影视| 免费a级毛视频| 婷婷丁香五月激情综合| 国产精自产拍久久久久久蜜| 办公室撕开奶罩揉吮奶头h文视频 久久精品国产亚洲av电影 | 日韩中文人妻无码不卡| 亚洲人成网站999久久久综合| 97人妻精品一区二区三区| 国产无套抽出白浆来 | 欧美精品免费观看二区| 国产女人18毛片水真多| 亚洲av色先锋资源电影网站| 亚洲熟妇无码一区二区三区导航 | 成年女人免费视频播放体验区| 国产成人无码区免费网站|